MP3 Calendar
Week of February 4-8
4. Continue work on MP3 calendar, after finishing it, hand it in
5. Update blog, correct midterm, and send it to mentor
6. Construction- start to mark and measure all items that will be made of lexan
7. Construction-finish all marking and measuring; cut out base pieces.
8. Construction- finish cutting base, start cutting sides, sand sides and bottom; update blog
Week of February 11-15
11. Construction- Finish sanding sides, and perform a dry fit of materials
12. Construction- After performing dry fit makes any corrections needed; start on drilling holes, update blog and mentor
13. Construction- continue drilling holes.
14. Construction- Finish drilling holes.
15. Construction- Run dry fit of all pieces update blog and mentor
Week of February 18-22
18. NO SCHOOL
19. Construction- start measuring and cutting claws, update mentor, and update blog.
20. Construction- Cut and sand claws to proper size.
21. Construction- Sand claws, and mark holes on the claws
22. Construction- Run dry fit of all materials, making any corrections where needed, update blog and mentor
Week of February 25-29
25. Construction- Place rods and through gears, and secure them together tightly, place gears with rods on base, for dry fit.
26. Construction- create motor support, update blog
27. Construction- continue work on the motor support
28. Construction- place motor on support and make any corrections if needed.
29. Construction- drill pilot holes for screws in all pieces of lexan, update blog and mentor
Week of March 3-7
3. Construction- screw top of the arm to the rest of the arm, make any corrections where needed.
4. Construction- Attach plastic rod to shaft of motor and run a trial of the gear system, update blog
5. Construction- Make any corrections to gear system fro previous day, and run another trial
6. Construction- Attach claws to gears, and assemble the whole arm.
7. Construction-Run trial of completed arm making any corrections needed, update blog and mentor
Week of March 10-14
10. Construction- finishes any adjustments and run a trial under water
11. Update blog, Construction- Make any corrections after trial run in water, and perform another trial
12. Construction- make any corrections after water trial, attach arm to ROV
13. Construction- attach arm to ROV and run tests
14. Start Press release, update blog and mentor
Week of March 17- 21
17. Work on press release
18. Update both blog and mentor, POOL DAY- prepare for pool day
19. Fix any problems that arose at pool test, finish press release.
20. Make any corrections to ROV after pool test.
21. NO SCHOOL
Week of March 31-April 4
31. Start presentation outline.
1. Finish presentation outline, and work on mentor contacts, update blog
2. Finish mentor contacts and prepare for pool test, update mentor
3. PRESENTATIONS- Hand in mentor contacts
4. PRESENTATIONS and pool day
Week of April 7-11
7. PRESENTATIONS
8. Fix problems from last pool day; prepare for new pool day, update blog
9. Make corrections from yesterday’s pool test
10. Prepare for pool day
11. Make corrections for last pool test, update blog
Tuesday, February 5, 2008
Subscribe to:
Post Comments (Atom)
12 comments:
Cut claw out from lexan and helped water seal body
today i worked on my drawings a little bit and looked up some information online reguarding my project.
today i will be sanding down my claws to the correct size and hopefully starting to mark the areas to drill on the lexan
Today i will mark the holes on my claws and start to create the motor support block for the arm.
Today I am drillign wholes in the lexan to make room for the screws that will be used to seal the top part of the arm.
Today i am going to drill the holes for the screws with mr alfonse. As well as update my mentor
today i am going to work on the press release and finish drilling holes in the lexan
Today I finished my press relaese and handed it in for a grade.
Today i am organizing my parts and brinign them home for the break to work on them
Today i will screw the top of the arm to the sides and possibly start the glueing process
Today I am going down to the lab and work on finishign my arm. Today I plan to cut the metal rod that will connect the motor and the worm gear, as well as touching up the back part of the arm.
Today I will work on the TSA tech report as well as finish my arm at home.